On Friday, June 8th, 2007.. The pouring of the concrete on the Rink floor took place. The frist concrete came out of the trucks around 7:30 am and went non-stop until about 1:30 pm. The 6 hour pour used about ~230 yards of concrete in pouring the 5 inch slab. Each concrete truck holds 10 yards, so there was a bit of action at the pump truck. ** Pics Added 6-17-07 **